IHIF Commercial, LLC will be completing construction work within the High Street Collection near NE Federal Drive, NE Park Drive, 9th Avenue NE, and Westridge Way NE. The planned work includes improvements along NE Federal Drive and the construction of two new underground stormwater detention vaults for the continued development of this property.

    Construction Updates:

    FALL 2026 to SPRING 2027

    Construction work within the High Street Collection near NE Federal Drive, NE Park Drive, 9th Avenue NE, and Westridge Way NE. The planned work includes improvements along NE Federal Drive and the construction of two new underground stormwater detention vaults for the continued development of this property.

    FALL 2025 TO FALL 2026

    IHIF Commercial, LLC has begun construction of a new park located on the southwest side of our property adjacent to NE Discovery Drive and the West Highlands Park neighborhood. This will be an active work area over the coming months as we complete grading, utilities, and site features for the future park space. Please check this site for any updates or traffic control measures.

    As of January 19th Sidewalk & parking will be closed immediately adjacent to Lot 8 for pedestrian safety and equipment access.

    • Closure will be in effect for the duration of the Project – re-opening July 2027
    NOVEMBER 2025

    Completion of Discovery Road right of way road work. All traffic control removed.

    SPRING/SUMMER/FALL 2025

    IHIF Commercial, LLC has finished their work on NE Discovery Drive. All traffic control has been removed. Please continue to check this page for any upcoming traffic impacts.

    MARCH 2025

    IHIF Commercial, LLC will break ground on our IHIF Commercial project this month. You will see construction progress of:

    • Survey for underground work
    • Mobilize equipment and material to project site
    • Set up traffic control
    • Establish work limits and install erosion control components
    FEBRUARY 2025

    Duration of First Phase of Discovery Drive Right of Way Work and Site Preparation for Issaquah High Street Collection Project is scheduled to start Spring 2025 and run through Fall of 2025. Please check back here for road and infrastructure improvements. 

    Community Update

    Please note that Excel Pacific has started work on the corner lot – 9th Ave NE and NE Discovery Drive (Lot 6). Work will be progressing on this lot, with staging planned on the adjacent lot (Lot 5). Please see the marked image below for reference.

    If you have any questions or concerns regarding these lots, potential road closures, or related construction impacts, please direct them to the contact below as these lots are not under IHIF Commercial’s ownership.

    John Hughes
    Exxel Pacific, Inc.
    Office: 425-230-5698
    [email protected]

    Get In Touch

    You may reach us with the contact form below.

    Renay Luzama | 425-559-2338

    Please enable JavaScript in your browser to complete this form.